Expansion Works of Al Sadr Port And digging The Alternative Water Channel
• DREDGING: Channel & Basin dredging -6.00m ACD.
• RECLAMATION: +3.50m ACD.
• ROCK REVETMENT: 1.74kms length.
• BREAKWATER: 148m long.
• SHEET PILE: 1531m length work.
• RO-RO RAMP: For berthing up to 18m wide vessels.
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
Real Estate
CONSTRUCTION OF NEW ISLAND AT WESTERN ABU DHABI
• NEW ARTIFICIAL ISLAND RECLAMATION: 1.5sq.km area, +3.50m ACD.
• ROCK REVETMENT: 2.1kms length, crest width 5.2m.
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
Commercial Properties
DIG THE NEW CANAL IN AL SADR AREA
• DREDGING: 7.5kms of channel, width of 80m, depth -4.00m ACD
• DISPOSAL OF DREDGE MATERIAL
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
Real Estate
CONSTRUCTION OF FLOATING DOCK & CANAL AT GHANTOOT NAVAL BASE
• DREDGING: 2.2kms of channel, depth -6.00m ACD & width 120m.
• RECLAMATION: Upto the height of +3.50m ACD
• ROCK REVETMENT: 489m on southside & 132m on westside with slope seaside slope 1:2 and portside slope 1:1.5
• BREAKWATER: 294m long with crest 3.8m.
• FLOATING DOCK: 200m length & 3m wide for accommodating 10 numbers of 13m naval combat boats.
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor